Crews transport Artemis IV liquid hydrogen tank at Michoud Assembly Facility
NASA crews have moved the massive liquid hydrogen tank for the Artemis IV mission at the Michoud Assembly Facility in New Orleans. The 130-foot-tall tank was transported from a production cell inside the main factory building to a detached test building on the 829-acre site on May 15, 2026. This tank will become part of the core stage for the Space Launch System (SLS) rocket, supplying super-cold propellant to one of four RS-25 engines. The move marks a key step in assembling the rocket for the Artemis IV mission, which aims to return humans to the Moon. The tank's successful relocation allows engineers to begin testing and integration work in the new facility. NASA officials have not yet announced a launch date for Artemis IV, but this development brings the mission closer to reality.
Sources
- NASASecondary
Related
NASA Swift rescue mission hits attitude control trouble
NASA’s Swift rescue satellite loses 2 of 3 reaction wheels
SpaceX rocket stage to hit moon with 11.8 gigajoules of energy
NASA robot tumbles out of control after component failures
Radio telescopes detect space junk in daylight for first time
Betelgeuse companion star captured in clearest image yet
Ariane 6 rocket completes first vertical liftoff
JWST finds no Dyson spheres around two candidate stars
Trending now
- Audi unveils 2027 Q9 full-size SUV flagship for US
- Mexican cartels outsource meth labs to Nigeria
- Kenya probes 15 elephant deaths in Amboseli park
- Meta's AI data center financing costs rise in $14 billion BlackRock deal
- Cyera acquires Oasis Security for $1B in third deal this year
- NASA Swift rescue mission hits attitude control trouble
- American Airlines grounds all flights nationwide after IT outage
- SK Hynix Q2 profit surges 557% to record high
Comments
No comments yet. Be the first.